Construction of a heat and power plant in Zabrze
General Contractor: Sumitomo SHI Energia Polska Sp. z o.o.
Range of works carried out by Nexus: Construction of a facade made of composite panels in the boiler building.
Construction of a facade made of box profile sheets in the bag filter building and the ash silo building.
Construction of roofs on the boiler building, the bag filter building and the ash silo building.
Physical roof surface area: 2625 m².
Physical facade surface area: 20400 m².
Start: May 2017.
Completion: June 2018.
Construction of a heat and power plant in Kędzierzyn-Koźle
General Contractor: Rafako S.A.
Range of works carried out by Nexus: Construction of a facade made of composite panels in the boiler building
and the transfer building 2.
Construction of a facade made of box profile sheets in the transfer building 1 and the ash silo building.
Construction of a facade made of cladding cassettes in the central control station building and the electrical building.
Construction of roofs on the boiler building and the central control station building.
Physical roof surface area: 1460 m².
Physical facade surface area: 6100 m².
Start: August 2016.
Completion: October 2017.
Reconstruction of Elektrownia Opole S.A.
General Contractor: Mostostal Warszawa S.A.
Range of works carried out by Nexus: Completion of assembly of the steel structure of an overhead ash conveyor.
Physical weight of the components: 130 tonnes.
Start: October 2016.
Completion: November 2016.
Construction of an aggregate processing plant in Trondheim
General Contractor: Sandvik France A.S.
Range of works carried out by Nexus: Completion of assembly of a steel structure.
Physical weight of the components: 610 tonnes.
Start: August 2015.
Completion: May 2016.
Construction of the Cosmopolitan Tower luxury residential building in Warsaw
General Contractor: Hochtief Poland S.A.
Range of works carried out by Nexus: Completion of assembly of the steel structure of a roof and a structure connecting buildings (pergola).
Physical weight of the components: 120 tonnes.
Start: March 2013.
Completion: September 2013.
Reconstruction of a hard coal mine “Ziemowit” in Lędziny
General Contractor: Carboautomatyka Sp. z o.o.
Range of works carried out by Nexus: Completion of assembly of the steel structure of a belt conveyor.
Physical weight of the components: 64 tonnes.
Start: April 2012.
Completion: May 2012.
Reconstruction of a coke plant “Victoria” S.A. in Wałbrzych
General Contractor: Carboautomatyka Sp. z o.o.
Range of works carried out by Nexus: Completion of assembly of the steel structure of belt conveyors.
Physical weight of the components: 340 tonnes.
Start: February 2012.
Completion: October 2012.
Construction of a melaphyre mine in Tłumaczów
General Contractor: Sandvik France A.S.
Range of works carried out by Nexus: Completion of assembly of a steel structure.
Physical weight of the components: 1100 tonnes.
Start: March 2011.
Completion: April 2012.
Construction of an aggregate processing plant in Piława Górna
General Contractor: Dolnośląskie Surowce Skalne S.A.
Range of works carried out by Nexus: Construction of structures enclosing the process equipment.
Physical weight of the components: 410 tonnes.
Start: December 2007.
Completion: August 2008.