Construction of a heat and power plant in Zabrze
General Contractor: Sumitomo SHI Energia Polska Sp. z o.o.
Range of works carried out by Nexus: Construction of a facade made of composite panels in the boiler building.
Construction of a facade made of box profile sheets in the bag filter building and the ash silo building.
Construction of roofs on the boiler building, the bag filter building and the ash silo building.
Physical roof surface area: 2625 m².
Physical facade surface area: 20400 m².
Start: May 2017.
Completion: June 2018.
Construction of a heat and power plant in Kędzierzyn-Koźle
General Contractor: Rafako S.A.
Range of works carried out by Nexus: Construction of a facade made of composite panels in the boiler building
and the transfer building 2.
Construction of a facade made of box profile sheets in the transfer building 1 and the ash silo building.
Construction of a facade made of cladding cassettes in the central control station building and the electrical building.
Construction of roofs on the boiler building and the central control station building.
Physical roof surface area: 1460 m².
Physical facade surface area: 6100 m².
Start: August 2016.
Completion: October 2017.